CASES

Beer

      Authorized by the relevant departments, GDE has elaborated Design Standard of Brewery, Design Standard of Malthouses and other design manuals. Through all these years, we have built long-term partnership with a great number of well-known beer companies at home and abroad. Our clients include Tsingtao Brewery, AB Inbev, China Resources Snow Breweries, Zhujiang Brewery, Kingway Brewery, Carlsberg, Yanjing Beer, Asia Pacific Brewries and Kirin Beer, etc.

Guangzhou Nansha Pearl River Beer Co., Ltd Annual 300,000 kL Beer Production Line Relocation Project

China Resources Snow Brewey( Sichuan) CO.ltd

Guangzhou Asia Pacific Brewery Co., Ltd.

Tsingtao Brewery (Fuzhou) Plant

Anheuser-Bush (Foshan) Brewing CO.ltd

China Resources Snow Brewery(LiuAn) Co.,Ltd.

Beijing Yanjing Beer Group Corporation

Kingway Brewery(ChenDu) Co.,Ltd.

HeBei ZhuJiang Brewery Co.,Ltd.

ZhanJiang ZhuJiang Brewery Co.,Ltd.

ZhongShan ZhuJiang Brewery Co.,Ltd.

DongGuan ZhuJiang Brewery Co.,Ltd.

Tsingtao Brewery(ChengDu)Co.,Ltd.

Tsingtao Brewery(YuLin)Co.,Ltd.

Tsingtao Brewery(Jinan)Co.,Ltd.

Tsingtao Brewery(XuZhou)Co.,Ltd.

Kingway Brewery(FoShan) Co.,Ltd.

Kingway Brewery(DongGuan) Co.,Ltd.

Kingway Brewery(XiAn) Co.,Ltd.

Benthanh Brewery Factory,Vietnam

Xinjiang Wusu Beer(WuSu)Co.,Ltd.

Brafaso Brewery Ouagadougou,Burkina Faso

Luoyang Asia Brewery Co.,Ltd.

Kun Ming Hua Shi Brewery Co.,Ltd.

Sderin Brewery(FuJian) Co.,Ltd.

Guangzhou Nansha Pearl River Beer Co., Ltd Annual 300,000 kL Beer Production Line Relocation Project

Time: Location:

The relocation project locates in Nansha Development Zone, Guangzhou. Annual capacity is expected to be 1.3 million kL beer. The design and construction of main workshop have been accomplished at a time and equipment will be moved phase by phase, where the 1st phase relocation leads to annual capacity 300,000 kL beer.
New technologies, such as no-soil filtration, automatic warehouse, flexible packaging line, low energy consumption saccharification are adopted.
Design began on Aug, 2011; construction started on Jan, 2013; Phase 1 works was completed on Sep, 2015; and relocation was completed in 2016.
Project Awards:
Guangdong Province 2019 Zhan Tianyou Hometown Cup Prize;
First Prize of 2019 Excellent Engineering in Light Industry

    China Resources Snow Brewey( Sichuan) CO.ltd

    Time:2007 Location:Chengdu

    The feasibility report, scheme design and work drawing for relocation and new build 600000 KL beer/year project.

     

      Guangzhou Asia Pacific Brewery Co., Ltd.

      Time:- Location:Huangpu District, Guanzghou

      Area covered: about 125,868 square meters (188.8 mu);
      Floorage: 57,089 square meters;
      Green area: 37,144 square meters;
      Description: The buildings of this project include: brew comprehensive building, facilities, packing house, office building, building for life service, wastewater treatment station, bicycle shed and so on.

        Tsingtao Brewery (Fuzhou) Plant

        Time:2004 Location:Fuzhou

        The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

          Anheuser-Bush (Foshan) Brewing CO.ltd

          Time:2008-2009 Location:Foshan

          The primary design and work drawing for the second continuation.

            China Resources Snow Brewery(LiuAn) Co.,Ltd.

            Time:2007-2008 Location:Liu an(Anhui)

            The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project.

              Beijing Yanjing Beer Group Corporation

              Time:- Location:Beijing

              The primary design, scheme design and work drawing for the Hi-tech Bacteria-free treatment and filling equipment technique improvement project: Pure draft beer 60000kl/year, beer 200000t/year, malt 200000t/year.

                Kingway Brewery(ChenDu) Co.,Ltd.

                Time:2006 Location:Chengdu

                The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 100000KL beer annual.

                  HeBei ZhuJiang Brewery Co.,Ltd.

                  Time:2007 Location:Lu quan(Hebei Province)

                  The feasibility report, scheme design and work drawing for the new build 100000 KL beer/year project.

                    ZhanJiang ZhuJiang Brewery Co.,Ltd.

                    Time:2005 Location:Zhan jiang

                    The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project; 2008: 50000bottle/hr filling production line design.

                      ZhongShan ZhuJiang Brewery Co.,Ltd.

                      Time:2005 Location:Zhongshan

                      The feasibility report, scheme design and work drawing for the first item of 100000 KL beer/year project (storage, filtration, package and related civil facilities).

                        DongGuan ZhuJiang Brewery Co.,Ltd.

                        Time:2004 Location:Dong Guang

                        The feasibility report, scheme design and work drawing for the new build 200000 KL beer/year project.

                          Tsingtao Brewery(ChengDu)Co.,Ltd.

                          Time:2007 Location:Chengdu

                          The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

                            Tsingtao Brewery(YuLin)Co.,Ltd.

                            Time:2005 Location:Yulin(shanxi)

                            The primary design and work drawing for the expanding plan of 100000 KL beer/year project.

                              Tsingtao Brewery(Jinan)Co.,Ltd.

                              Time:2006 Location:Jinan

                              The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

                                Tsingtao Brewery(XuZhou)Co.,Ltd.

                                Time:2005 Location:Xuzhou

                                The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

                                  Kingway Brewery(FoShan) Co.,Ltd.

                                  Time:2007 Location:FoShan

                                  The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

                                    Kingway Brewery(DongGuan) Co.,Ltd.

                                    Time:2007 Location:Dongguan

                                    The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project; 200000KL beer annual project.

                                      Kingway Brewery(XiAn) Co.,Ltd.

                                      Time:2007 Location:XiAn

                                      The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

                                        Benthanh Brewery Factory,Vietnam

                                        Time:2007 Location:Vietnam

                                          Xinjiang Wusu Beer(WuSu)Co.,Ltd.

                                          Time:2007 Location:Wushu(Xinjiang)

                                          The work drawing for the re-constructed 120000KL beer/year project.

                                            Brafaso Brewery Ouagadougou,Burkina Faso

                                            Time:2007 Location:Brafaso

                                            100000 kl/year plan( the first phase is 50000kl/year)

                                              Luoyang Asia Brewery Co.,Ltd.

                                              Time:2006-2007 Location:Luoyang

                                              The feasibility report, scheme design and work drawing for the relocated 200000KL beer/year l project.

                                                Kun Ming Hua Shi Brewery Co.,Ltd.

                                                Time:2006 Location:Kun Ming

                                                The work drawing for the relocated 120000KL beer annual project.

                                                  Sderin Brewery(FuJian) Co.,Ltd.

                                                  Time:2005 Location:Futian(Fujian)

                                                  The feasibility report, scheme design and work drawing for the expanding plan of 50000 KL beer/year project.