Location:HomeNewsCompany News

NEWS

(86)020-81326513

Glad tidings丨GDE has successively won bids for multiple projects Edit Date:2024/03/12

       Recently, GDE has continued to make efforts in its business, adding new achievements in the fields of New energy and New materials, Municipal Construction, and Traditional Light industry.

 Jiangmen Zhuxi New Materials Agglomeration Zone Distributed Energy Station Project Supporting Heating Network Engineering (Phase II) Jiecheng and Tinci EPC General Contracting Project

       The project is located in Xinhui District, Jiangmen City, with steam pipeline heat source outlet working parameters of 1.8MPa (g) and 240 ℃; Design parameters 2.0 MPa (g), 260 ℃. This project is the EPC heating network project that has won consecutive bids since the first phase of EPC, marking the client’s recognition of GDE’s comprehensive strength and good corporate image, and laying a solid foundation for continuing to develop heating network EPC projects.

 EPC project for the connection of external drainage pipes to Donghai Island Industrial Tailwater No.2 Pump Station for the Zhanjiang Base Water Supply and Drainage Expansion Project of Guangdong Guanhao High-tech Co., Ltd

       The project is located in Donghai Island, Economic and Technological Development Zone, Zhanjiang City, Guangdong Province. The construction content is to connect and lay the drainage pipeline of the Donghai Avenue section, and process the processed production tail water from the Zhanjiang base of Guangdong Guanhao High-tech Co., Ltd. through the factory drainage pump room. Pressure is sent to the Municipal Donghai Island Industrial Tail Water Pumping Station No. 2 through drainage pipes.

 Guizhou Jinsheng Tiannai New Energy Materials Co., Ltd. 100000 tons/year Phosphate (Manganese) Iron Precursor Project

       The project is located in the Phosphorus Coal Chemical Ecological Industrial Base in Xifeng County, Guiyang City. The overall plan is to build a new 100,000 tons/year iron phosphate (manganese) precursor. It will be constructed in two phases. The first phase covers an area of 113 acres and will build 2x20kt/a battery-grade iron phosphate. and related supporting facilities.

 Meizhou Pearl River Brewery Co.,Ltd Newly added bottled pure draft beer production line and related supporting production system upgrade and renovation project

       The project is located in Meizhou Pearl River Brewery of Meizhou High-tech Industrial Park, Guangdong. The construction content is to add a bottled draft beer filling line with a capacity of 40,000 bottles/hour, replace the existing bottled ordinary beer production line of 20,000 bottles/hour, and expand Add brewing fermentation tank equipment (including non-standard tanks), and conduct accounting and upgrade of the production supporting systems involved in the upgrade. At the same time, a new finished product warehouse of about 8,000 square meters was added, a new bottle loading shed of about 2,600 square meters was added, a 2,400 square meter bottle loading area was renovated, and municipal supporting facilities in the factory area were added to rationally plan the logistics flow lines to meet production and use needs.

 Capacity expansion and upgrading project of Zhongshan Pearl River Brewery Co.,Ltd

       The project is located in Zhongshan Torch Development Zone, Guangdong, with a total construction area of approximately 85000 square meters. The construction content is to increase the brewing capacity by 300000 tons, increase the annual sales volume of 160000 tons of beer, including 60000 tons of pure raw beer, 100000 tons of canned beer, corresponding supporting production facilities, and the intelligent upgrading and transformation of the entire system.